Blanchard AFB Phase I ESA’s
Emerson Avenue
Carmel Park East Parking Structure
I-65 Added Travel Lanes Design-Build
16 Tech Phase I Water Improvements
Sessom Drive Intersection Improvements
HAM-Plainfield Road Roundabouts
East Wilco Highway (Corridor E5)
Licking County Study
Columbus I-70 4R
City of Xenia Towne Square Public Infrastructure Redevelopment
Westfield Washington Public Library and Westfield Washington Township Trustee Office
SR 44 and Kepler Road Roundabout
Newman Road Underpass
SR 619 and Pickle Road Roundabout
Bonita Springs Infrastructure Improvements
Chisholm Trail Road at Old Settlers Boulevard Intersection Improvement
CR 1101 Bridge Replacement
South Bend Equalization Basin
Range Line Road Corridor
Bitting School Road
Bebee Road Improvements
CR 258 Extension from US 183 to Sunset Ridge
I-275 at I-4 Downtown Tampa Interchange (DTI) Design-Build, FDOT District 7
Goodwin Street Pedestrian and Drainage Improvements
I-69 Finish Line Project
US 52 and SR 9 Roundabout
On-Call Construction Inspection Services for City of Columbus
River Ridge Construction Management and Inspection Services
Refresh Evansville Program Management
Indiana American Water Construction Inspection
Private Fire Water Main Extension for Rickenbacker Exchange
City of Pickerington General Engineering and Inspection Services
US 62 (19th Street) from I-27 to Marsha Sharp Freeway
I-65 Design-Build Segment B
I-65 Northwest Indiana Expansion Design-Build
Transform 66 Outside the Beltway
Non-IOCP Sewer Program Construction Engineering and Resident Project Representative Services
Stormwater Program Management
16 Tech Program Management
Carmel Program Management
Red Line Bus Rapid Transit (BRT)
Finch Creek Fieldhouse
Downtown Smart Street Initiative
Gemini Parkway Extension Design-Build
Michigan City Police Station
Infosys Pedestrian Bridge
RM 3237 and RM 150 Roundabout
I-69 Finish Line, Section 4 Construction Inspection
I-90 Rehabilitation
LaPorte County Courthouse Renovation and Expansion
Fort Wayne Lakeside Sewer Separation
Blueprint Stormwater System Assessment (Morrill/Ann)
Cooper Road Pump Station and Tank
Stormwater Feasibility Study
Indianapolis-Marion County Community Justice Campus
Mill Creek Expressway Phase 5A (HAM-75-3.84) Design-Build
143 West Market Street
Columbia Street/Blaine Avenue Storm Relief
Oberting Road Water Main Relocation and Storage Tank
Lawrenceburg Water and Sewer Master Planning
Century Acres Wastewater Treatment Plant Upgrade
Lehnert Farms and Bolton Field SSI
Carmel West Main Street Development
Saddle Run Stormwater System Improvements
SR 37 Morgan County Design/Build
Manhole Rehabilitation Research for WERF
Buffalo Street Stormwater Drainage Study
Midwest WWTP Evaluation
Citizens Energy Group Lift Station Rehabilitations
Lehmann Farms Due Diligence/Development Study
Churchman Road Phase I
Gary Marina Access Road
Center Large-Diameter Assessment
I-69 Section 5 Technical Procurement Advisor
South Dearborn Regional Sewer District Wastewater Treatment Plant
Cumberland Avenue Reconstruction, Phase 3
NSC Creditors Trust
On-Call Erosion and Sediment Control Inspection
I-69 Erosion and Sediment Control Inspection, Segments 1-3
IDI World Connect Building 1 at Ameriplex
Jackson Street over White River Bridge
SR 152 over CSX and IHB RR Bridge
Fall Creek/White River Tunnel System
Indiana American Water Main Replacement Program
Water Main Replacements Program
Bray Homestead Mitigation Site
Westfield Boulevard and 96th Street Roundabout
Bass Road Corridor Improvement
Speedway Road Improvement Project
Dearborn County Bridge Number 55 – Bridge Replacement
I-69 Section 5 from Bloomington to Martinsville Design-Build
Fullerton Pike Preliminary Engineering Assessment
Illiana Expressway P3 Design-Build
Grand Boulevard Roadway and Roundabout
Prairie Street over Norfolk-Southern Railroad
39th Street over Fall Creek
Briggs Road Area Water Line Improvements
Pontiac Street/Wayne Trace Intersections
SR 57 Bridge Over the West Fork White River - Bridge Replacement
Keystone Parkway and Grand Drive at 116th Street
I-70 Reconstruction (Super 70) Design-Build
CR 400 South and CR 300 South Connector
Kennedy Park Sewer Separation
SR 441 over the Wabash River
Butler Compensatory Flood Storage Mitigation Project
US 50 Bridge Utility Relocation
SR 17 over Eel River Bridge
Keystone Parkway at 126th Street
I-65 Johnson County Added Travel Lanes Design-Build
SR 101 over Ohio River Bridge
SR 67 over I-75 Bridge Rehabilitation (AUG-67-3.45)
Columbus General Engineering Services Transportation
Hazel Dell Parkway
Illinois Street South Extension
West 21st Street Relief Sewer
Airtech Park Pond Relocation/Wetland Delineation
Lincolnway and Sturdy Road
Lift Station 20-Year and 50-Year Life Cycle Evaluation
Grange Hall Road Widening (GRE-CR25-4.76)
St. Joseph River CSO/River Stabilization Study
Swanson Road Interceptor Master Plan
US 50 Water Main and Storm Sewer Upgrades
Keystone Parkway at 136th Street
Cass Avenue Sanitary and Stormwater Improvements Phase I-V
Roselawn Area Water and Wastewater Master Plan
Geist, White River, and Fall Creek Production Well Replacement Design
Avon Town Hall and Police Station
Central Avenue Reconstruction from County Line Road to Willowcreek
Keystone Parkway at 131st Street
Water Master Plan, 20-Year Capital Improvement Plan
Keystone Parkway at 106th Street
Illinois Street and 116th Street Reconstruction
East Chicago Water Membrane Filtration Plant
US 50 Flood Gate at Tanners Creek
OSU Street and Bridge Maintenance, Phase 1, Part B
NICTD RR over Galena River Bridge
Hammond Marina Access Road and Bridge
East Chicago Marina Access Bridge
I-70/SR 9 Interchange (BEL-70-17.73)
Lebanon Public Safety Building
Fire Station No. 93
Hendricks County On-Call Engineering
Grandview 56th and 57th Street STEP Sewers
Kentucky Avenue Bridge over Big Eagle Creek
Lawrenceburg Tanners Creek Bridge
Lincoln Avenue from Grimm Road to Frame Road, Phase II
Oak Grove Road, Phase I - Vanderburgh/Warrick County Line to Libbert Road
Oak Hill Road Reconstruction Phase I
Calumet, Roosevelt, and Vale Park Roundabout Construction Inspection
Whiting Lakefront Development
Fire Station No. 3, Purdue Research Park
Fire Station No. 4, Washington Township
169th Street from Harrison Avenue to Southeastern Avenue Phase IV Reconstruction
169th Street Rehabilitation, Southeastern Avenue to Lindberg Avenue
45th Avenue from Cleveland Street (SR 55) to Chase Street, Phase IIA
Oak Hill Road Improvements, Phase II
Lincoln Avenue Reconstruction
Lawrence Utilities Phase II Wellhead Protection Plan (WHPP)
Phase II Wellhead Protection Plan, Eastern Bartholomew Water Company
IAWC Robinson Wellfield Hydrogeologic Services
Waverly Wellfield Design and Construction Administration
Gatewood Water Supply System
SR 331 Expressway (US 20 Bypass to Jefferson Boulevard)
Production Well No. 4 at South Wellfield
Fulton County Water Supply Study
Harbour Well Design
State Boulevard Reconstruction Project between Spy Run and Cass Street
Hobart Sanitary District GIS Technical Services
Bridge 513 on Jackson Street over White River Replacement
I-65 from State Road 44 to State Road 252, Patching and Rehabilitation
Thompson Ditch/Poplar Street Sewer
Water Pollution Control Facility Construction Phase Services
St. Joseph/Beckett Run Equalization Facility
Whiting Lakefront Mass Grading and Ball Field Construction Management and Inspection
Chicago Street Reconstruction and Widening
Brand Road/Bristol Parkway and Dublin Road/River Forest Road Bike Path Tunnels
CityBus Downtown Traffic Impact Study
Coolspring Avenue
Franklin Street Streetscape Improvements
Broadway Street and Main Street Reconstruction
CR 250 S over Rain Creek (Mt. Zion Dam) Bridge
I-469 Pavement Rehabilitation - SR 1 to US 27
Hively Avenue Reconstruction
16th Street/Crawfordsville Road/Georgetown Road Intersection Reconstruction
I-71 Design-Build (MRW-71-12.19)
I-80/94 Borman Expressway Phase II Design-Build
Mason Road and Hickory Woods Drive Roundabout
Lindberg Road over Celery Bog Bridge
Maplecrest Road over Maumee River Bridge
I-65/I-70 Rehabilitation (Hyperfix)
Cleveland Road and Bittersweet Road Roundabout
Greensburg/Decatur County Area Road Improvements
Ohio River Bridges East End Crossing P3 Design-Build
SR 62 and Fulton Avenue Interchange
US 421 at SR 62 Intersection Improvements
I-465/I-70 Interchange Design-Build
MOT-75-11.01 (Phase Ib) I-75/US 35 Urban Interchange Widening
Maplecrest Road Extension
Ronald Reagan Parkway
Veterans Memorial Parkway
Oak Hill Road over Pigeon Creek Bridge
Olio Road over I-69 Bridge
State Boulevard, Spy Run to Cass Street
Sixth Street/Gordon Road/West Shafer Drive
Subarea Interchange Planning Study, I-65 Corridor
US 24 over Wabash River Bridge
Washington Street Over White River Bridge
CR 17 Phase IA
CR 17 Phase IB
Lazelle Road Roadway and Water Main Improvements
Main Street Water Line Improvements
Lawrence Sanitary Sewer Evaluation Study and CMOM Program
Lake Station Water Filtration Plant
Greendale Wastewater Master Plan
Noblesville Wastewater Treatment Plant Phosphorus Removal Study
Speedway Waterworks Improvements
Potts Ditch Storm Sewer
Law Enforcement Facility
Hamilton County Sheriff's Office and Adult Detention
Speedway WWTP UNOX and Biosolids Upgrade
Sage Road/Poppy Road Lift Station Modifications
Fort Wayne Primary and Secondary Treatment and Digester Improvements
Regina Avenue Water Line Improvements
Emerald Parkway Improvements
Rising Sun Wastewater Treatment Plant
Portage Water Reclamation Facility
Fort Wayne WPCP Effluent Pump Station
CSO 012 and 013, Deep Rock Tunnel Connector Sewers
Geist Water Treatment Facility
Gerrard and Allison Storm Relief
I-70 Exit 59 Wastewater Facilities Masterplan
Lawrence Phase I Sewer Rehabilitation
Fort Wayne Wet Weather Pump Station Improvements
Washington Wastewater Treatment Plant
CSO LTCP Integrated Planning Reevaluation Project
Rockville WWTP Phosphorus Removal Design
Anderson Water System Preliminary Engineering
Lafayette Street Water Treatment Plant
Bradford Woods Wastewater Treatment Plant
East Chicago Main Street Reconstruction
Tippecanoe County Parking Facility
Speedway Main Street Reconstruction
Transportation and Stormwater Program Management
Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) Program
Corydon Wastewater Treatment Plant
146th Street from Promise Road to Boden Road
Hague Road Bridge over Cicero Creek
Waverly Wellfield Raw Water Main
Rising Sun Well Design Raw Water Main
Kokomo Long-Term Control Plan Addendum No. 2 and Rate Analysis
Purdue University Animal Science Research and Education Center Waste Separation
40th and Butler Avenue Drainage Improvements
Glendale Road Lift Station
Green River Road - Millersburg Road to Kansas Road
45th Avenue Widening and Improvements
AEP RR Spur over Lawrenceburg Trail Bridge
Bridge No. 330 - West Jefferson Boulevard Over St. Mary's River
Bridge No. 537 - Tecumseh Street over Maumee River
Dudley-Epler Barrett Law Sanitary Sewer
Illinois Street Corridor
Towne Road from 116th Street to 146th Street
Massillon Road/Steese Road Roundabout
Avery Road/Tuswell Drive Roundabout
Yeager Road Reconstruction
SR 161 and Riverside Drive
Mason-Montgomery Road and Bethany Road
Exit 10 Infrastructure Design
Flying J Travel Plaza Water Wells, Treatment, and Storage
Garden City Water Main Distribution System
Cumberland Avenue Road Extension
Boston Street Improvements
Colfax Avenue Over Little Calumet River Bridge
Buffington Harbor Mixed-Use Development Feasibility Study
Dan Jones Road and CR 200 South Roundabout
Greendale-Lawrenceburg Levee
Evansville Program Management Support for IOCP
I-65 Boone County Added Travel Lanes Design-Build
Veterans Memorial Parkway Water Main Replacement
SR 53 Water Main Relocation
Water Main Emergency Repair
Indian Creek Wellfield Expansion
Alum Storage Facility, White River Water Treatment Plant
Floatables Control Structure for CSO Outfall 009-010
Belmont North Interceptor Capacity Study and Rehabilitation Design
Broadway-Tekoppel Sewer Project
Warfield Relief Sewer
Lawrenceburg West Levee
US 31 Reconstruction
US 421, Milton-Madison Bridge over the Ohio River
I-65 Segment A Design-Build
I-65/US 30/61st Avenue Design-Build
I-275 Design-Build (HAM/CLE-275-32.27)
I-77/US 62 Design-Build (STA-77-11.59/62-34.616)
I-465/I-65 South Interchange Modification
US 31 Kokomo Corridor
SR 25 Hoosier Heartland Corridor
FRA-270-36.94 (I-270 Outerbelt Modernization and Bridge Rehabilitation)
SR 161 Relocation (LIC-161)
I-69 Expansion from I-64 to SR 68 Design-Build (Phase I, Segment I)
Indianapolis International Airport Midfield Terminal Roads and Bridges
ESG-EWSU Centrifuge Improvements
Southport Advanced Wastewater Treatment Plant
169th Street Rehabilitation
ALL-Vine Street Railroad Grade Separation
US 50 over Tanners Creek Bridge
CampusParc Capital Program Management
Indiana Avenue Underpass
Bridge No. 123
Upper Valley Bridge Construction Management
INDOT Construction Inspection On-Call Contracts
ODOT On-Call Construction Inspection Services
Keystone Parkway Corridor
Wastewater Treatment Plant Rehabilitation
Jeffersonville Clarksville Flood Control District Pump Stations
East Side Urban Ditch
Carpentier Creek Study
US 24 Fort to Port
Big Creek Watershed Study
I-94 Rehabilitation Design-Build
Prospect/English/Brookville Traffic Signal System
Madison Street Traffic Signal Modernization
Traffic Signal Optimization
Traffic Signal Analysis and Design, Red Line Bus Rapid Transit (BRT)
Green River Road - Boonville-New Harmony to SR 57
Houchard Road Site Development Study
Green River Road - Kansas Road to Boonville-New Harmony Road
Wilson Branch Flood Control Reservoir
Williams Express Wastewater Treatment Facility
Bridge No 203 Baseline Road over CSX
Jefferson Boulevard over St. Joseph River Bridge
CR 825 E over Wabash River Bridge
Hyperion: 910,000 SF Warehouse
Public Safety Building
Medco Automated Pharmacy
Park 100
Rivertown Trail over Unnamed Ravine Bridge
Noe-Bixby Road Stormwater and Water Line Improvements
Old National Bank at Clay Terrace
International Drive Basin Study
US 231 over Wabash River Bridge
War Memorial to the Common Man
Lake Station Municipal Complex
Ivy Tech Fire Training Area Storage Building
Anson Development
FedEx Parking Lot Expansion
Back 40 Parking Lot Green Improvements
Brownsburg Fire Station No. 2
Clarian People Mover
Federal Express Traffic Analysis
Fall Creek Township Assessor's Office
Flagstar Bank, Harrison Crossing
Intermodal Hub Feasibility Study
Hague Road Extension
Danville Avenue, Chestnut Street and Wallace Avenue over Dry Branch Creek Bridge
Lift Station 313 Capacity Upgrade
Madison Avenue Reconstruction
Hendricks County Jail Screening Facility
IMAX Theatre and Parking Garage for White River State Park
Hulman Street Reconstruction and Stormwater Pump Station
Elevated Water Tanks
Michigan Boulevard
Washington/Ohio/Market Street Interchange Reconstruction
Twyckenham Drive over St. Joseph River Bridge
Walker Boat Ramp Improvements
Kokomo CSO 041 Sewer Separation
Wastewater Treatment Plant Expansion IV
Fort Wayne WPCP Process Review & Operational Manual Updates
Whiting Lakefront Redevelopment
Veterans Memorial Park
Margaret Avenue Reconstruction
Elkhart Law Enforcement Facility
Gibson County Coal South Facility Package Wastewater Plant
Industrial Screener Study
Loves Truck Stop Infrastructure, SR 109 and I-70