Ronald Reagan Parkway

Hendricks County, Indiana

Phase I of this project included supplemental construction inspection to INDOT for the construction of the Ronald Reagan Parkway interchange at I-70. The project included construction of new bridges, roadways, traffic signals, lighting systems, and entrance and exit ramps. For Phase II, American Structurepoint provided construction inspection for approximately 2 miles of new 4-lane QC/QA PCCP concrete pavement, concrete curb and gutter, new storm sewer system, sanitary sewer, sanitary sewer lift station, two four-sided box culverts, and a new signal intersection located on US 40 and Ronald Reagan Parkway. This LPA project was built to INDOT standards and specifications. The pavement section consisted of 60,500 square meters of QC/QA concrete pavement.