Wastewater Treatment Plant Rehabilitation

Terre Haute, Indiana

American Structurepoint is the lead inspecting consultant, providing construction inspection and administration services for upgrades to this plant. The project entails 30 separate areas, including new structures and process facility modifications. As the new facilities are being constructed on the existing wastewater treatment plant, there will be extensive coordination with the Terre Haute operations staff to ensure ongoing treatment operations are maintained throughout the construction effort. Construction is scheduled over a three-year period; however, several significant elements have a one-year early completion requirement.

News