45th Avenue from Cleveland Street (SR 55) to Chase Street, Phase IIA

Crown Point, Indiana

Specialists from American Structurepoint performed road construction inspection services for the reconstruction of 45th Avenue from 800 feet west of Chase Street heading east approximately 4,578 feet to the project terminus located at Cleveland Street (SR 55). The existing 2-lane roadway will be removed and replaced with a section that includes one 12-foot lane in each direction with a 16-foot-wide, 2-way left-turn lane running down the middle of the roadway. The roadway cross-section will be constructed using full-depth QC/QA HMA pavement over subgrade treatment type IA, and includes new concrete curb and gutter along both sides of the roadway. New 5-foot-wide concrete sidewalk will be constructed along both sides of the roadway as well.