Cleveland Road and Bittersweet Road Roundabout
Mishawaka, Indiana
This LPA project included the reconstruction of the existing four-way, stop-controlled intersection at Bittersweet Road with Cleveland Road as a modern roundabout and widening of Cleveland Road to a five-lane section approaching the intersection. The project also included the replacement of two culverts conveying Juday Creek under the west and north approaches. Major work elements included full-depth pavement reconstruction, curb and gutter construction, roundabout lighting, and drainage swale grading along the length of the project. The scope also included a categorical exclusion to assess socioeconomic and environmental impacts of the project and a cold-water drainage system to protect the salmonoid stream crossing.
News
- Glasswater Creek of Plainfield Receives National Recognition For Design Excellence
- American Structurepoint to Serve As Advisor for 16 Tech Signature Bridge Project
- Noblesville Wastewater Treatment Upgrades Cited In National Engineering Competition
- Company Provides Engineering Services to Red Line Bus Rapid Transit Project
- American Structurepoint Begins New Era – Relocates to 9025 River Road
- Matt Moore, PE, Joins American Structurepoint as Vice President
- Mark Tomlinson Joins American Structurepoint As Technical Director of Transportation in Austin
- South Bend Smart Streets Initiative Wins First-Place ARTBA Globe Award
- Will Conley Joins American Structurepoint as Principal
- Diversification Drives American Structurepoint's Success
- City of Green Roundabout Project Wins ACEC Ohio Engineering Excellence Award | American Structurepoint
- American Structurepoint Projects Receive Three ACEC Indiana Awards
- American Structurepoint Hires Walid Gemayel, PE, as Senior VP of Ohio Team
- Sportsplex Groundbreaking Keeps Hammond Hot Streak