American Structurepoint has completed design and bid phase services for the Glendale Road Lift Station. The design includes “near-term” and “long-term” pumping scenarios. Both scenarios are intended to pump all sewage flow from an existing 24-inch interceptor sewer in order to eliminate surcharging problems on the existing gravity sewer that have caused overflows in the past. The near-term pumping scenario includes pumping up to 4.5 MGD to the soon-to-be renovated Aqua Midwest wastewater treatment plant. The “long-term” pumping scenario also assumes a maximum pump rate of 4.5 MGD from the Glendale Road Lift Station but instead will pump to the St. Mary’s Interceptor following completion of the 3RPORT project.