SR 37 Corridor Improvements
Bitting School Road
LUC-Monroe Street/Silica Drive Bridge
Ohio River Bridges East End Crossing P3 Design-Build
Mill Creek Expressway Phase 5A (HAM-75-3.84) Design-Build
I-275 at I-4 Downtown Tampa Interchange (DTI) Design-Build, FDOT District 7
Gemini Parkway Extension Design-Build
Transform 66 Outside the Beltway
I-65 Added Travel Lanes Design-Build
169th Street from Harrison Avenue to Southeastern Avenue Phase IV Reconstruction
OSU Street and Bridge Maintenance
Indiana Avenue Underpass
I-65 from State Road 44 to State Road 252, Patching and Rehabilitation
US 421, Milton-Madison Bridge over the Ohio River
Mill Run Road
Oregon Road Improvements (WOO-CR 107-1.73)
Winchester Pike Bridge Replacement (FRA-CR376-0.87)
Columbus Construction Inspection and Materials Testing 2018-2024
Refresh Evansville Program Management
US 50 Floodgate Replacement
Purdue University Boilermaker Sculpture Plaza
Purdue Gateway Arch
Athenaeum Artwork Foundations
16Tech Parking Structure