169th Street from Harrison Avenue to Southeastern Avenue Phase IV Reconstruction

169th Street from Harrison Avenue to Southeastern Avenue included the reconstruction of approximately 1.1 miles of existing 169th Street. The proposed roadway cross section was constructed using full-depth QC/QA HMA pavement over subgrade treatment type IA. The proposed cross section from our engineering consultants included new concrete curb and gutter along both sides of the roadway. New 5-foot-wide concrete sidewalks were installed between Harrison Avenue and Southeastern Avenue along both sides of the roadway (R-31466).

DISCIPLINES

Construction Solutions

SERVICES

Transportation

Water + Wastewater

LOCATION

Hammond, Indiana