Hulman Street Reconstruction and Stormwater Pump Station

American Structurepoint designed a 9,000-gpm stormwater pumping station to provide drainage for roadway improvements and future development. Conceptual design included extensive cost analysis of storage versus pumping options. Final design included coordination with road plans, as well as electrical and structural engineers to prepare final lift station drawings and specifications. As part of this project, American Structurepoint also designed plans for reconstruction of 1.5 miles of Hulman Street and new landscaping trees were planted along the corridor. The construction cost was $8.8 million.

DISCIPLINES

Construction Solutions

SERVICES

Water + Wastewater

LOCATION

Terre Haute, Indiana