Cherry Tree Clearwell Expansion
American Structurepoint was selected for the design and permitting of a new 500,000-gallon clearwell at the 3 MGD Citizens of Westfield Cherry Tree water treatment plant, and a 16” diameter finished water main approximately 1,450’ along 146th Street near Bladstone Road with a control valve and meter vault. Additional scope items include buried control valves at the Cherry Tree plant and on Midland Lane and Cherry Tree Road, and a grinder pump and low-pressure sanitary sewer that will discharge into the City of Noblesville sanitary sewer system.
American Structurepoint was selected for the design and permitting of a new 500,000-gallon clearwell at the 3 MGD Citizens of Westfield Cherry Tree water treatment plant, and a 16” diameter finished water main approximately 1,450’ along 146th Street near Bladstone Road with a control valve and meter vault. Additional scope items include buried control valves at the Cherry Tree plant and on Midland Lane and Cherry Tree Road, and a grinder pump and low-pressure sanitary sewer that will discharge into the City of Noblesville sanitary sewer system.
DISCIPLINES
Utility Infrastructure
SERVICES
Municipal
LOCATION
Westfield, Indiana


