Hazel Dell Road, Kirkendall Creek to SR32

Noblesville, Indiana

This $12.5 million project constructed 2.14 new miles of Hazel Dell Road (4-lane divided) from Kirkendall Creek to SR 32, including a roundabout intersection, concrete curb and gutter, multi-use trails, storm sewer system, water main, traffic signal, two 3-sided bridge structures, and construction of approximately 0.66 mile of the A.J. Brock regulated legal drain, including storm sewer and open-channel grading.