Grandview Phase II Septic Tank Elimination

Indianapolis, Indiana

This project included designing sanitary sewer systems for five neighborhoods currently served by septic systems to prevent pollution. The project included 41,900 feet of 8-inch gravity sewers, two lift stations, 3,100 feet of 4-inch force main, and 16,500 feet of low-pressure sewer systems. The low-pressure system services 78 homes, each of which was provided with a grinder pump station to pump the wastewater to a small-diameter pressure line within the street R/W and then to a gravity line. A stormwater collection system was also designed to eliminate flooding occurrences in some neighborhoods.

Read More +