Binford Boulevard Rehabilitation

Indianapolis, Indiana

Work on this rehabilitation of Binford Boulevard from 38th to 75th Streets consisted of major improvements at the intersections of 75th Street, Kessler Boulevard, Keystone Avenue, and 38th Street, as well as minor improvements at the remaining 12 intersections. The $7.9 million project included resurfacing with QC/QA HMA along with concrete base reconstruction, concrete curb and sidewalk placement, and traffic signal upgrades at all 12 intersections, including the installation of Opticom emergency vehicle preemption equipment. The mainline pavement rehabilitation included milling 3 inches of the existing pavement and replacing it with approximately 5 inches of new HMA.