116th Street Early Action Maintenance of Traffic for Keystone Parkway

Carmel, Indiana

With a complex construction schedule anticipated for the 116th Street and Carmel Drive interchange project, American Structurepoint developed a smaller maintenance-of-traffic project to jumpstart construction between the two interchanges. This system successfully maintained traffic during construction of the larger interchange project.