Water System Distribution/Site Drainage Upgrades, VA Medical Center Campus, Butler, Pennsylvania

 
1 of 1
 

American Structurepoint provided architecture and engineering services to improve the overall water distribution system to the Butler VA medical campus. It was critical to analyze, report, and recommend upgrades to the 200,000-gallon elevated steel water tank built in 1938. Our Phase I analysis determined a new water tower would be required. American Structurepoint was then selected for phase II, to assist in the design of the new tower and any additional site improvements.