Water System Distribution/Site Drainage Upgrades, VA Medical Center Campus, Butler, Pennsylvania

 
 
1 of 2
 
 
Services included survey, utility, site/civil, environmental, and structural engineering services to deliver an overall system analysis for the upgrade to the water distribution system. Our Phase I analysis determined the need for a new water tower while Phase II includes the demolition of the existing water tower and construction of a new water tower. The project required a quick design schedule to meet tight funding timelines. Anticipated construction cost is $2.8 million.