In collaboration with design/build partners, American Structurepoint designed the reconstruction of the Interstate 465/Interstate 70 interchange on the east side of Indianapolis. The project was designed and built in less than 24 months. Work included adding travel lanes, bridges, and replacing pavement on ramps — all while maintaining six lanes of traffic on I-465.