White Lick Connector  
 
1 of 4
 
 

American Structurepoint evaluated alternative and designed a new lift station and force main to connect the White Lick Creek Wastewater Treatment Plant to the expanded WCCD Wastewater Treatment Plant.  This 2- to 3-pump lift station is designed to pump 1,050-gallon-per-minute average daily flow for a distance of 11,500 feet via a 16-inch-diameter force main.