US 24 Fort to Port

Allen County, Indiana

American Structurepoint prepared design plans for over 5,000 lft of stream mitigation and over 15 acres of wetland mitigation for impacts along the new 11-mile stretch of US 24. After conducting a wetland delineation along the proposed alignment and identifying the mitigation areas, American Structurepoint began the design process. Stream mitigation designed along Schaaf Ditch and Marsh Ditch consisted of constructing a 2-stage channel along one bank of each stream, and regrading along the opposite bank.

Read More +
News