Fort Wayne Primary and Secondary Treatment and Digester Improvements

Fort Wayne, Indiana

As a part of a team of consultants, American Structurepoint is providing engineering services to upgrade the existing digesters and construct a new digested sludge pumping station. The design effort included architectural and structural components. Also, Fort Wayne opted for a guaranteed saving contract approach for the construction phase. Therefore, the portions of the structural design were accelerated to accommodate construction schedule. With the design completed, American Structurepoint is providing construction administration services including shop drawing reviews, information requests and periodic site visits to ensure conformance with contract documents.