I-65/US 30/61st Avenue Design-Build

Merrillville, Indiana

American Structurepoint teamed with Walsh Construction to prepare the technical package and winning bid to reconstruct 3.5 miles of I-65 and interchange modifications at US 30 and 61st Avenue. The technical proposal was completed, submitted, and approved within eight weeks. The project included interchange reconstruction design, as well as highway signing, lighting, and traffic signal installations. The project was completed early, receiving the maximum incentive bonus at completion.